TESCO / RETAIL
Change at retail scale.
Value in the operation.
Workforce systems, supply chain analytics and sustainability delivery across separate retail transformation assignments.
Workforce scheduling · MicroStrategy · Tableau · Operational pilots
Approximate summaries of delivery scope and results, reflecting work delivered with the wider teams.
THE DELIVERY / AT A GLANCE
- 01Workforce systems
- 02Operational compliance
- 03Supply chain analytics
- 04Sustainability pilot
THE OPERATING CONTEXT
The situation.
Our Tesco experience covered distinct assignments: workforce scheduling and PDA-based systems, followed by sustainability and supply chain transformation. Each required a connection between systems, operating practices and measurable business value.
Our contribution.
In workforce transformation, we delivered scheduling and PDA-based systems that supported improvements in night-shift compliance. In later supply chain and sustainability work, we shortened analytics production using MicroStrategy and Tableau and delivered a reverse-vending pilot involving DEFRA and Coca-Cola Europe.
THE PRACTICAL VALUE
The work delivered.
Workforce scheduling changes generated indicative annual savings of more than £2.5m, with compliance improving from approximately 45% to 78%. Separately, the analytics production cycle reduced from around 12 weeks to one week. These results relate to different workstreams and are presented separately.
Operational improvement needs a recognisable measure of value. The right evidence may be compliance, effort, reporting time or service performance, depending on the change being delivered.
CONNECT THE EXPERIENCE
A useful next step.
LET’S CONNECT THE WORK
What needs to move forward?
Tell us what is changing, where you are in the process and where you need a clearer plan.
Start a conversationwebsite@leanpro.co.uk